Pest Control Expert Termite Proofing in Laguna
Termite Treatment - pre-construction soil and liquid barrier treatment
What is pre-construction termite treatment?
Before a building is constructed a termite barrier can be applied to the soil, after it is made level and before the concrete is poured, to prevent future termite intrusion into the building foundation from the soil below.
Who needs this pre-construction termite treatment service?
All general contractors that build new commercial buildings.
All architectural firms that create plans for new commercial buildings.
Why is this pre-construction termite treatment needed?
Most states and national builders require commercial termite preventive soil barrier treatment during the build out process.
Who can complete this preventive termite treatment service?
Only a company that holds a Termite Category Commercial Pesticide Applicator license in the state where the termite treatment is to be performed and has a truck equipped with a 100-gallon or larger spray rig may provide this service. Experience is required to accommodate the tight time frames and multiple pours of concrete normally required of large commercial termite treatments.
What is involved in this pre-construction termite treatment service?
Preventive pre-construction termite treatment involves applying approximately 1/10th of a gallon of premixed material (residual termiticide formulation) per square foot of soil before the concrete is poured, using a large tank truck and power spray equipment.
Water is mixed with concentrated termiticide in a tank, and this formulation is sprayed onto the soil that will be covered with concrete slab and injected into the soil that abuts the foundation wall and footer.
A normal pre-construction termite treatment job can be done at the rate of 400 mixed gallons covering about 4000 square feet of floor space per hour.
When will this pre-construction termite treatment service be performed?
Before the concrete is poured during building construction, after the soil is graded to level and all the plumbing and structural fixtures are in place.
A minimum temperature of 45 degrees Fahrenheit for 6 hours and a wind speed below 10 MPH are required to properly mix and apply the termite treatment.
Often in larger jobs there will be several separate concrete pours and the termite treatment is done within 24 hours of each pour.
What are the pre-construction termite treatment options available to me?
The primary method is a residual liquid formulation applied to the soil, but a more expensive and equally effective option is baiting.
Both preventive treatment options achieve the same results.
What are the risks involved in this pre-construction termite treatment service?
Weather delays.
Drift from wind causing material translocation.
Over/under application of material.
Leaching of material through soil to non-target areas.
Where can you perform this commercial pre-construction termite treatment service?
Anywhere in the Philippines; from Aparri to Jolo.
FAQ
Do you have to visit the construction site to provide a price quote?
No – as long as we have official project documents with dimensions on a building schematic to calculate job size.
How quickly can you provide a price quote?
Normally within hours of being provided project dimensions we will provide a professional proposal for your review and approval.
How long will it take to complete this preventive termite treatment project once approved?
We normally schedule each project within a day of your approval by calling you directly and working out with you the best schedule to complete your project. During this call we will work out a planned start date, time and project duration if it requires more than 1 day.
What are the Chemical Products you use for this job?
We only use the most effective products available today such as Termidor Sc, Agenda 10 Sc and Wazary 10 FL
Contact us for a free preventive termite treatment evaluation today.
Agenda 10 SC
​Non Repellent Chemical Formula
Termidor SC
​​America's No. 1 Termite Defense
Wazary 10 FL
water-based flowable (suspension) concentrate​​
